VMAC Inventory Storage Facility

Site excavation

Concrete foundation

Construction, framing & insulation

about this project

After Summit Steel Buildings was hired to manufacture and supply a 5,600 square foot metal facility for VMAC’s Nanaimo, B.C. location, they chose Double Black Construction as their preferred erector for the project. It is the second building VMAC has ordered to be constructed through the companies. 


The 75’ x 75’ x 26’ structure rests upon a solid concrete foundation and the building’s interior is insulated with a waterproof lining for durability against the location’s hot and humid conditions.

  • The construction team prepares the tools and materials needed for a new VMAC job.

    Slide title

    Write your caption here
    Button
  • Primary steel framing gets delivered to site.

    Slide title

    Write your caption here
    Button
  • Steel i-beams are piled at the construction site in Nanaimo, B.C.

    Slide title

    Write your caption here
    Button
  • View of the concrete foundation poured on site for VMAC in Nanaimo.

    Slide title

    Write your caption here
    Button
  • Nice view of wooden forms and concrete foundation pad at PEMB site in British Columbia.

    Slide title

    Write your caption here
    Button
  • Tradesperson inspects concrete foundation pad in Nanaimo, BC.

    Slide title

    Write your caption here
    Button
  • Completed concrete foundation pad for PEMB structure by Double Black Construction.

    Slide title

    Write your caption here
    Button
  • First steel framing beam erected on site in Nanaimo for VMAC.

    Slide title

    Write your caption here
    Button
  • Primary steel framing in place at PEMB construction project on Vancouver Island in B.C.

    Slide title

    Write your caption here
    Button
  • Sunny day as steel framing is added to building construction site.

    Slide title

    Write your caption here
    Button
  • Closer look at primary framing being used for steel building project in BC.

    Slide title

    Write your caption here
    Button
  • Skilled trades use crane to lower steel beams into place for PEMB project.

    Slide title

    Write your caption here
    Button
  • Photo shows how primary steel framing is supported by concrete foundation.

    Slide title

    Write your caption here
    Button
  • Skilled team of workers add steel I-beams to building construction project.

    Slide title

    Write your caption here
    Button
  • Steel I-beam framing and concrete foundation pad work together.

    Slide title

    Write your caption here
    Button
  • Steel wall framing at PEMB project site in Nanaimo, British Columbia.

    Slide title

    Write your caption here
    Button
  • Crane elevator lower steel beams into place for building project.

    Slide title

    Write your caption here
    Button
  • Steel beam gets lowered into place for roof structure at metal building project.

    Slide title

    Write your caption here
    Button
  • Steel framing almost complete for British Columbia PEMB project.

    Slide title

    Write your caption here
    Button
  • Closeup look at primary steel wall framing for metal building.

    Slide title

    Write your caption here
    Button
  • Roof and wall framing sits atop a concrete pad for building project.

    Slide title

    Write your caption here
    Button
  • Double Black Construction truck parks in front of PEMB project in Nanaimo.

    Slide title

    Write your caption here
    Button
  • Metal wall panels being added to wall framing at PEMB project.

    Slide title

    Write your caption here
    Button
  • Steel wall panel being added at Double Black Construction erector site.

    Slide title

    Write your caption here
    Button
  • Side wall completed at PEMB construction project in BC.

    Slide title

    Write your caption here
    Button
  • Metal side wall panels being added to PEMB structure.

    Slide title

    Write your caption here
    Button
  • PEMB project half completed - see the interior and metal walls.

    Slide title

    Write your caption here
    Button
  • DBC truck in front of metal wall panel installation at PEMB project.

    Slide title

    Write your caption here
    Button
  • Construction crew adds metal wall panels to building.

    Slide title

    Write your caption here
    Button
  • Brown metal wall panels completed at PEMB building project.

    Slide title

    Write your caption here
    Button
  • Team uses elevator to add metal panels to top of PEMB structure.

    Slide title

    Write your caption here
    Button
  • Double Black Construction skilled trades team at VMAC project site in Nanaimo.

    Slide title

    Write your caption here
    Button
  • Canvas added to roof framing at PEMB project in B.C.

    Slide title

    Write your caption here
    Button
  • Interior look at the roof and wall framing as well as waterproof lining.

    Slide title

    Write your caption here
    Button
  • Aerial view of roof panels being added to PEMB project.

    Slide title

    Write your caption here
    Button
  • Two members of the construction crew inspect metal roofing panels.

    Slide title

    Write your caption here
    Button
  • Side view of metal building project on Vancouver Island in British Columbia.

    Slide title

    Write your caption here
    Button
  • Elevator lift adds metal components to construction project in BC.

    Slide title

    Write your caption here
    Button
  • Aerial view of PEMB project nearing completion for VMAC in Nanaimo.

    Slide title

    Write your caption here
    Button
  • PEMB construction project for VMAC.

    Slide title

    Write your caption here
    Button
  • Double Black Construction on site at PEMB project.

    Slide title

    Write your caption here
    Button
  • John Lohan, engineers and tradesperson inside a PEMB project in BC.

    Slide title

    Write your caption here
    Button
  • PEMB construction is ideal for commercial and industrial building projects.

    Slide title

    Write your caption here
    Button
  • Pre-engineered metal building construction nearing completion.

    Slide title

    Write your caption here
    Button
  • Exterior look of a finished PEMB construction project.

    Slide title

    Write your caption here
    Button

Construction site images taken between April and May 2026.

Installed a pre-engineered metal building (PEMB) in Nanaimo, B.C. measuring 75' x 75' x 26'. The full project included a concrete pad foundation, reinforced with steel, erecting primary and secondary framing and installing the steel roofing and wall component systems. Both the roof and wall were insulated and lined with a waterproof lining barrier to protect the inside from the rainy environment. The building was completed between April 24, 2026 and May 22, 2026 by our small but skilled crew of tradespeople.


The steel structural system was provided by Summit Steel Buildings. Precision and accuracy of the build full exceeded their high standards for quality, safety and engineering compliance.

The finished metal building provides a durable, well-insulated and fully compliant structure tailored to VMAC’s need for a large inventory storage space. The steel framing provides low-maintenance durability and security against outside threats while the waterproof linings ensure long-term performance and safety for the materials stored inside.

Side view of the pre-engineered building being constructed in Nanaimo, BC by Double Black Construction.